Production Strength & Quality System
Two plants, one production plan — see the lines, the equipment, the capacity and the certificates behind every package we ship.
Two Factories, One Building Package
TAIHUA · Color Steel & Purlin Factory
Roll forming of color steel roofing and wall sheets, C/Z purlin cold forming, sandwich panel compounding and hardware assembly. Finished goods warehouse and container loading yard on site.
JIANGXIN · Steel Structure Factory
Cutting, welding and shot blasting of H-beam columns and rafters, complete portal frame fabrication and prefabricated steel building supply, with its own gantry crane bays.
Key Production Lines
The equipment list below is the honest version of “are you a real factory” — replace the numbers with your actual line counts before publishing.
Four Checkpoints Before Shipment
Raw Material
Coil mill certificates, zinc and coating thickness verification on intake.
In-Process
Profile dimension, punching accuracy and weld inspection during production.
Pre-shipment
Full dimension and quantity check with photo and video records.
Third Party
SGS / BV / TÜV inspection arranged on request before loading.
Certificates & Compliance
One screen that answers the trust question. Replace the placeholders below with real certificate scans — and delete anything you do not hold.
Capacity that ships on schedule
A plan you can build your programme around.
Production slots are confirmed at order confirmation, and a container loading plan is issued before packing so your site programme and customs clearance run without surprises.
- 15–25 day lead time for standard packages
- Loading plan with piece counts and container mix
- FOB / CIF / DDP terms, export documentation handled
- Installation guidance and remote video support